EAST SIDE MALL, Berlin
Reference description
Equipment of a shopping center with refrigeration, heating and sanitary technology on 3 sales levels (ground floor, 1st floor and 2nd floor), food court and 2 parking spaces arranged above as well as a fitness center and a daycare center with outdoor play area on the 3rd floor.
Revision and assembly planning and subsequent assembly of cold and heat generators, transport services and transfer systems.
Cooling supply
Wilhelm Theis GmbH has successfully implemented the heating and cooling supply. Specific details on the producers' services can be found in the list.
Heat supply
Cooling supply
Further links to the property:
https://www.zeit.de/kultur/2018-11/east-side-mall-berlin-friedrichshain-konsum-tourismus
https://porr.de/projekte/east-side-mall/
https://www.berlin.de/special/shopping/einkaufscenter/3874670-1724954-east-side-mall.html
Architects Aschauer + Burkhardt Ingenieurgesellschaft mbH:
http://www.ab-ingenieure.com/REFERENZEN/East-Side-Mall/east-side-mall.html
https://structurae.net/de/bauwerke/east-side-mall
Construction board
Client:
FREO Ltd
Kurfurstendamm 195
10707 Berlin / Germany
Location
Berlin-Friedrichshain
Friedrichshain-Kreuzberg, Berlin
Architect:
Aschauer + Burkhardt
engineering company ltd
www.ab-engineers.com
General planner
Ed. Züblin AG - Stuttgart branch
Albstadtweg 5
70567 Stuttgart
Client:
Forum Invest S.à.rl
Contact Person
Mr. Winkler, ED. Züblin AG
construction time
2016 - 2018
Technical building equipment:
Wilhelm Theis GmbH
Friedrichstrasse 23
56470 Bad Marienberg
www.theis-gmbh.de